abter steel pipe logoabter steel pipe logoabter steel pipe logoabter steel pipe logo
  • HOME
  • ABOUT US
    • ORGANIZATION
    • OUR CULTURE
    • CERTIFICATE
    • CLIENT
      • CLIENT VISITS
      • CASES
      • CUSTOMER ENQUIRY
  • PRODUCTS
    • Pipe Fittings
    • OCTG
      • Tubing & casing
      • Drill pipe
      • Heavy weight drill pipe & drill collar
    • Line Pipe
      • Common pipeline
      • Special service and coated & lined pipe
    • Structural Pipe
      • Round, square & rectangular pipe
      • Galvanized pipe
      • Pipe piling & drilling
    • Pressure pipe
      • Boiler, heat exchanger, condenser & super heater tube
      • Low, ambient and high temperature service
    • Engineering tube
      • General engineering service
      • Mechanical and precision tube
  • PROJECT
    • PROJECTS
    • TEST REPORTS
  • NEWS
    • Company Dynamic
    • Industry News
    • Products News
    • Key Technology of Pipe
    • research and development Technical Information
  • CONTACT
✕

The production process of SSAW

  • Home
  • News Products News
  • The production process of SSAW
Carbon peak carbon neutral Chinese steel to explore the world’s forefront
May 31, 2021
Long and short entanglement steel city before the festival to break the deadlock still need an opportunity
June 9, 2021

The production process of SSAW

Spiral steel pipe is a kind of spiral seam steel pipe which is made of strip steel coil as raw material, often formed by warm extrusion and welded by automatic double-wire double-side submerged arc welding process.

(1) raw materials that is, strip coil, welding wire, flux.They are subjected to strict physical and chemical tests before they are put into use.

(2) The butt joint of strip steel head and tail adopts single-wire or double-wire submerged arc welding, and automatic submerged arc welding is adopted after rolling into steel pipe.

(3) before forming, strip steel after leveling, edge cutting, edge planing, surface cleaning and conveying and edge bending treatment.

(4) The electric contact pressure gauge is used to control the pressure of the oil cylinder pressed on both sides of the conveyor to ensure the smooth transport of strip steel.

(5) the use of external control or internal control roller forming.

(6) The weld gap control device is used to ensure that the weld gap meets the welding requirements, and the pipe diameter, the amount of wrong side and the weld gap are strictly controlled.

(7) Single wire or double wire submerged arc welding is adopted for both internal and external welding by Lincoln welding machine in the United States, so as to obtain stable welding specifications.

(8) The welds after welding are inspected by online continuous ultrasonic automatic flaw tester to ensure 100% nondestructive testing coverage of spiral welds.If there is any defect, it will automatically alarm and spray mark, so that the production workers can adjust the process parameters at any time and eliminate the defect in time.

(9) The steel pipe is cut into single pieces by air plasma cutting machine.

(10) After being cut into a single steel pipe, each batch of steel pipes shall undergo strict first inspection system to check the mechanical properties, chemical composition, dissolution status of the weld, the surface quality of the steel pipe and pass nondestructive inspection to ensure that the pipe making process is qualified before being formally put into production.

(11) The parts on the weld with continuous acoustic flaw detection marks shall be rechecked by manual ultrasonic and X-ray. If there are any defects, they shall be repaired and then undergo nondestructive inspection again until the defects are confirmed to be eliminated.

(12) All the tubes where the butt-welding welds of strip steel and the T-joint intersecting the spiral welds are inspected by X-ray TV or film.

(13) Each steel pipe is subjected to hydrostatic pressure test, and the pressure is radial sealed.The test pressure and time are strictly controlled by the tube hydraulic microcomputer testing device.The test parameters are automatically printed and recorded.

(14) The pipe end is machined so that the verticality of the end face, groove Angle and blunt edge can be accurately controlled.

Share
0
Lisa Tan
Lisa Tan

Related posts

August 19, 2022

Differences between the characteristics of different grades of alloy steel pipes, and application cases


Read more

ASTM A691, ASME SA691 Grade 1-1/4CR Alloy Steel Welded Pipe

August 12, 2022

A691Gr2-1 / 4CrCL22 high temperature and high pressure steel pipe


Read more
August 12, 2022

Introduction to A335 P91 Alloy Pipe- 10Cr9Mo1VNb


Read more
July 15, 2022

Quality requirements for seamless steel pipes


Read more
July 9, 2022

erw ,roll bending pipes,sprial pipes,different manufacturing processes


Read more
July 5, 2022

Classification, production process and mechanical properties of seamless steel pipes


Read more
June 29, 2022

API 1104 Sources of Piping and Related Facilities


Read more
June 23, 2022

Basic knowledge and uses of seamless steel pipes, oil casings and pipes


Read more

mild steel and stainless steel seamless pipeSeamless pipe, mild steel

June 21, 2022

Seamless Steel Pipe Wall Thickness Variation Control Technology


Read more
June 21, 2022

How wear occurs in pipes and why high-strength wear-resistant steel outperforms regular steel pipe in abrasive environments


Read more
June 20, 2022

Welded vs. Seamless Production in the Tube-Making Process


Read more
June 17, 2022

Classification and function of casing


Read more

Comments are closed.

  • API 5CT Casing Pipe in Grade J55/K55, N80
    RFQ API N80 Premium Threaded CASING and JOINT
    March 23, 2023
  • Enquiry 9 5/8″ L 80 BTC Seamless Steel casing API spec.5CT
    March 23, 2023
  • Requirements for the installation and use of eyewash in steel pipe manufacturing plants.
    March 17, 2023

Manager

    Project Manager:Lisa Tan
    +86-317-3736333
    abter2016@163.com
    Sitemap

Translation

EnglishالعربيةবাংলাNederlandsFrançaisDeutschItalianoBahasa MelayuپارسیPortuguêsਪੰਜਾਬੀRomânăРусскийCрпски језикEspañolภาษาไทยTürkçeTiếng Việt

Contact us

    Address: 7th Floor,Shengji International Building,Beijing Road,Yunhe District,Cangzhou City,Hebei Province,China 
    Tel : 0086-317-3736333
    Fax: 0086-317-2011165 
    Mail: abter2016@163.com

Main Keywords

  • API seamless Casing
  • oil casing pipe
  • Oilfield Steel Casing Pipe
  • n80 pipe
  • en10217 erw
  • 3pe steel pipe
  • J55 Seamless Casing
  • API 5DP drill pipe
HEBEI ABTER STEEL PIPE CO.,LTD - Mail : Abter2016@163.com