Economiser tubes for South Africa Project
June 26, 2015
Steel pipes and fitting for Malaysia construction projects
June 26, 2015Top Project Details
Project location | Bangladesh | Products | Pre-insulated pipe | Standard & Material | ASTM A53 Gr.B |
---|---|---|---|---|---|
Specification: OD*WT (MM) | 26.7*2.87 33.4*3.38 42.2*3.56 48.3*3.68 60.3*3.61 73*5.16 88.9*5.49 114.3*6.02 168.3*7.11 219.1*8.18 355.6*11.13 508*15.09 | Application: | HVAC construction | Quantity: | 529 tons |
Inquiry time | Apr, 2021 | Order Time: | Sep, 2021 | Shipping time | Nov, 2021 |
Arrive time: | Jan, 2022 | Third party inspection | – |
This order is from our old customer who is the Top EPC in Bangladesh. The material is for the Airport central air conditioning HVAC construction project. We completed the production on time and passed inspection. Everything went very smoothly. Our customer is satisfied with our product quality and service.