abter steel pipe logoabter steel pipe logoabter steel pipe logoabter steel pipe logo
  • HOME
  • ABOUT US
    • ORGANIZATION
    • OUR CULTURE
    • CERTIFICATE
    • CLIENT
      • CLIENT VISITS
      • CASES
      • CUSTOMER ENQUIRY
  • PRODUCTS
    • Pipe Fittings
    • OCTG
      • Tubing & casing
      • Drill pipe
      • Heavy weight drill pipe & drill collar
    • Line Pipe
      • Common pipeline
      • Special service and coated & lined pipe
    • Structural Pipe
      • Round, square & rectangular pipe
      • Galvanized pipe
      • Pipe piling & drilling
    • Pressure pipe
      • Boiler, heat exchanger, condenser & super heater tube
      • Low, ambient and high temperature service
    • Engineering tube
      • General engineering service
      • Mechanical and precision tube
  • PROJECT
    • PROJECTS
    • TEST REPORTS
  • NEWS
    • Company Dynamic
    • Industry News
    • Products News
    • Key Technology of Pipe
    • research and development Technical Information
  • CONTACT
✕

Enquiry for the supply of OCTG CASING TUBING

  • Home
  • Clients and Cases Customer Enquiry
  • Enquiry for the supply of OCTG CASING TUBING
ASTM A139 LSAW Structural pipes and pile pipes for low pressure liquid delivery
API2H LSAW PIPE 5728 MTONS for AYBI STEEL
September 5, 2022
Steel pipe welding processes A brief analysis of the technical characteristics 
September 20, 2022

Enquiry for the supply of OCTG CASING TUBING

Dear Sirs / Madam,                                                                         BUYING ENQUIRY

 

Please note subject is purchasing enquiry ( 5 Years Contract ) and we kindly request you to submit your quotation for the Supply of Pipes as per the below specification and would appreciate receiving your offer

on or before 5th Mar  2022.

 

Moreover please reply to below listed Points ( Point 1 to 16) along with compliance and relevant documents.

 

Notes:

1). The price should be valid for 180 days.

PRICE ADJUSTMENT MECHANISM

 Prices shall remain fixed for the first Six months from the commencement date of the

contract. From Six months onwards, prices will be reviewed as per the price adjustment

mechanism every Six months.

Periodic review shall be conducted every six months in order to cater any change in the price

up or down within ±10% for the unit rate in each line item during the contract period. Agreed

price shall be applied in accordance to the agreed price adjustment formula and used

index/indices.

( Formula to be agreed upon signage of contract )

 If the variation of the rates post apllying the price adjustment within ±4%. there will be no

change on the previously agreed rate..

 

2). Please comply below mentioned delivery schedule:

The supplier shall maintain safety stock representing tour months consumption in a local yard in OMAN.
The delivery of the first quantity of GOODS and material, including the Safety Stock, as stipulated in the first BLANKET RELEASE /call out, shall be within five (5) months from Contract award.
Subsequent Call-Outs/8lanket Releases shall be delivered from local yard to Daleel sitee warehouse or well site within 5 days from acknowled gment of Call-out / Blanket Release.
The SUPPLIER shall be responsible to replenish the Safety Stock in cases where some of the stock was consumed as instructed by the DALEEL.
The SUPPLIER shall endeavor to replace the Safety Stock regulary with new stock to avoid possible damage that may be caused by long storage durations.

3). Please advise if the shipment will be in Containers and kindly advise what will be approximate total quantity of containers.
4). Provide warranty for a period of eighteen (18) months from the date of delivery to DALEEL Field or twelve (12) months from the date of successful installation and testing at the WORKSITE, whichever is earlier,
5). Submit endorsement and support letter from the principle ( Mill ) if vendor representing original manufacturer.
6). Bidder to submit the necessary proof documents showing that proposed casings must comply with API specifications or equivalent.
7). Bidder to submit the necessary proof documents showing that proposed casing thread must comply with API standard 5B or equivalent.
8). Bidder to submit mill’s track record in supplying similar casings to other buyers.
9). Back‐up letter from the mill which will certify the origin of the OCTG.
10). Bidder to submit track record in supplying OCTG to other buyers for last three years; Experience of Tubular Management.
11). Submission of manufacturer’s QA/QC system, API and ISO certification.
12). The BIDDER must provide mobilization Gantt Charts to reflect the proposed initial mobilization plan to arrive at Work Site from the date of award. The BIDDER must state the point of origin of the proposed resource required for the CONTRACT.
13). Proposed casings must comply with API specifications or equivalent.
14). Proposed casing thread must comply with API standard 5B or equivalent
15). Provide at least two (2) CV’s of key personnel having at least 3 years relevant experience.
16). Please sign and stamp the attached Scope of work.

ase sign and stamp the attached Scope of work.

 

 

Ser. No.

 

 

OCTG (Daleel Requirement)

 

Estimate consumo tion for

one year

 

DDU Price per MTR delivered at Daleel Warehouse or rig site

 

Description

QTY

UOM

Unit Cost (USD)

1

CASING,18‐5/8 IN,K‐55,R3,87.5LBS/FT, BTC

113

METER(S)

 

2

CASING,13‐3/8 IN,K‐55R3,54.5LBS/FT,BTC

145

METER(S)

 

3

CASING,13‐3/8 IN,K‐55,R3,68LBS/FT  , BTC

801.734

METER(S)

 

4

CASING,13‐3/8 IN, L80,R3,68LBS/FT , BTC

5

METER(S)

 

5

CASING,9‐5/8 IN,K‐55,R3,36LBS/FT,BTC

93150

METER(S)

 

6

CASING,9‐5/8 IN,K‐55,R3,40LBS/FT,BTC

15525

METER(S)

 

7

CASING,9‐5/8 IN,K‐55,R3, 43.5LBS/FT,BTC

5

METER(S)

 

8

CASING,9‐5/8 IN,L80,R3, 43.5LBS/FT,BTC

5

METER(S)

 

9

CASING,9‐5/8 IN,K‐55,R3, 47LBS/FT,BTC

5

METER(S)

 

10

CASING,9‐5/8 IN,L80,R3, 47LBS/FT,BTC

2000

METER(S)

 

11

CASING,7 IN, SMLS,K55,R3 , 23LBS/FT,BTC

60140

METER(S)

 

12

CASING,7 IN,K‐55,R3,26LBS/FT,BTC

5

METER(S)

 

13

CASING,7 IN, L80,R3 , 29LBS/FT,BTC

5

METER(S)

 

14

CASING,4‐1/2 IN,K‐55,R3,11.6LBS/FT,LTC

24000

METER(S)

 

15

CASING,4‐1/2 IN,L80,R3, 12.6LBS/FT, VAM TOP

5

METER(S)

 

16

TUBING,3‐1/2IN, EUE, J‐55, R2, 9.3 LBS/FT

60000

METER(S)

 

17

TUBING,3‐1/2IN, J55 GRE (DUOLINE 20) , 9.3 LBS/FT, EUE

5

METER(S)

 

 

18

TUBING,3‐1/2IN, J55 GRE LINER, TK INCLUDES 1 Ring PER JOINT ,9.3 LBS/FT, EUE

110000

METER(S)

 

 

19

TUBING,2‐7/8 IN, J55,R2,6.4LBS/FT,  EUE

244800

METER(S)

 

 

 

 

20

CROSSOVER,CASING,13‐3/8IN BTC BOX X 9‐5/8IN PIN, K‐55

5

Number(s)

 

 

21

CROSSOVER,CASING,7IN BTC BOX X 7IN LTC PIN, 23LBS/FT, K55

5

Number(s)

 

 

22

CROSSOVER,CASING,7IN BTC PIN X 7IN LTC BOX , 23LBS/FT, K‐55

5

Number(s)

 

 

23

CROSSOVER,CASING,4‐1/2IN BTC BOX X 4‐1/2IN LTC PIN , 11.6LBS/FT, K‐55

5

Number(s)

 

 

24

CROSSOVER,CASING,4‐1/2IN BTC PIN X 4‐1/2IN LTC BOX , 11.6LBS/FT, K‐55

5

Number(s)

 

 

25

PUP JOINT,13‐3/8IN, 54.5LBS/FT, BTC ‐ PIN X PIN, 1.3 MTR LONG

5

Number(s)

 

 

26

PUP JOINT 3‐1/2IN, J55, 9.3LBS/FT,EUE ‐ 0.9 MTR LONG

50

Number(s)

 

 

27

PUP JOINT, 3‐1/2IN, J55, 9.3LBS/FT,EUE ‐ 1.5 MTR LONG

100

Number(s)

 

 

28

PUP JOINT, 2‐7/8IN, J55, 6.4LBS/FT,EUE ‐ 0.9 MTR LONG

5

Number(s)

 

 

29

PUP JOINT, 2‐7/8IN, J55, 6.4LBS/FT,EUE ‐ 1.5 MTR LONG

200

Number(s)

 

 

30

PUP JOINT, 3‐1/2IN, J55, BOX X PIN WITH CBR, GRE COATING, EUE ‐ 0.9 MTR LONG

133

Number(s)

 

 

31

PUP JOINT, 3‐1/2IN, J55, BOX X PIN WITH CBR, GRE COATING, EUE ‐ 1.5 MTR LONG

133

Number(s)

 

 

32

Supervision/Well Running Services for Liner by Service Engineer

143

DAY(S)

 

 

33

Standby charges per person per day

10

DAY(S)

 

 

34

Additional CBR Ring

986

Number(s)

 

 

35

GRE lining services for 3 ½”, 9.3#, J55, EUE

10

METER(S)

 

 

36

(1) One meter LENGTH 7″ K55 26# BTC pup joint

51

Each

 

 

37

(3) meter LENGTH 9.5/8 ” K55 40 # BTC joint

16

Each

 

 

38

(5) meter LENGTH 9.5/8 ” K55 40 # BTC joint

16

Each

 

 

39

(7) meter LENGTH 9.5/8 ” K55 40 # BTC joint

16

Each

 

Schedule- 2

optional line items

Bidder to submit the rates for below listed line items as optional.

 

 

Ser. No.

 

 

OCTG (Daleel Requirement) Optional Line Items

 

DDU Price per MTR delivered at Daleel Warehouse or rig site

 

Description

UOM

Unit Cost (USD)

1

18.5/8”, 87.5#, K55, BTC, R3 gas tight thread

METER(S)

 

2

13.3/8 72# ppf L80, R3 gas tight thread

METER(S)

 

3

9.5/8″, 53‐ 58.4#, P110 gas tight thread

METER(S)

 

4

7″, 35#, P110 ,R3 gas tight thread

METER(S)

 

5

5.5”, 23#, P110 R3 gas tight thread

METER(S)

 

 

Thanks & Regards,

Asif | Sales Manager – [Engineered Products & Services Div.] | VANGUARD Services LLC |Rusayl Industrial Estate, Road No 14|P.O.Box: 1506, Oman|

Share
0
管理
管理

Related posts

ASTM SAWL API ERW x52 low carbon stainless seamless steel pipe for onshore gas and oil pipeline
January 22, 2023

Tuyauterie amont le matériel série CL600 pression 70bar ou 20 bar


Read more
ASTM A139 LSAW Structural pipes and pile pipes for low pressure liquid delivery

ASTM A139 LSAW Structural pipes and pile pipes for low pressure liquid delivery

September 5, 2022

API2H LSAW PIPE 5728 MTONS for AYBI STEEL


Read more
API 5CT L80 Casing and Tubing
August 31, 2022

Inquiry coated tubing 3-1/2″ L80 type 13Cr, tubing with internal protective coating


Read more
August 31, 2022

Evergreen Steel company Want buy Cold rolled EN10219 S355JOH seamless pipe


Read more
August 2, 2022

Seamless Steel Pipes and Fittings for SHARJAH NATIONAL OIL CORPORATION EOI


Read more

carbon steel pipe,Seamless Steel Pipe, Seamless Stainless Steel Pipe, Steel Pipng;Cold Drawn Seamless Pipe

July 26, 2022

Inquiry for Pipe Seamless – Carbon Steel, Low alloy Steel, from Lagos, Nigeria


Read more
July 26, 2022

RFQ MR. supply of carbon steel pipes and Elbows


Read more
July 20, 2022

PETRO-CO Inquiry ASTM-A312 GR . SS 304L & TP316L pipe , ERW , BEVELED ENDS no.PTC-98-045-FB


Read more
July 20, 2022

ALDEAL LTD INQUIRY, for Offshore Drilling TUBES


Read more
October 16, 2018

Reducing elbow inquiry : ASTM A234 GR.WPB,ASME B16.9, 90-LONG


Read more
October 16, 2018

BOILER TUBE TO A210 GR. A1, SIZE: 38.1MM OD X 3.2MM THICK Enquiry


Read more
October 16, 2018

30 Inch Lsaw API 5L, Grade X 46, 3LPE Coated Steel Line Pipe – ENQUIRY


Read more

Comments are closed.

  • ASTM SAWL API ERW x52 low carbon stainless seamless steel pipe for onshore gas and oil pipeline
    Tuyauterie amont le matériel série CL600 pression 70bar ou 20 bar
    January 22, 2023
  • Our Clients | Solutions for Customers | Pipe And Fittings Manufacturing Business
    October 28, 2022
  • n80 casing pipe
    n80-casing-pipe
    October 13, 2022

Manager

    Project Manager:Lisa Tan
    +86-317-3736333
    abter2016@163.com
    Sitemap

Translation

EnglishالعربيةবাংলাNederlandsFrançaisDeutschItalianoBahasa MelayuپارسیPortuguêsਪੰਜਾਬੀRomânăРусскийCрпски језикEspañolภาษาไทยTürkçeTiếng Việt

Contact us

    Address: 7th Floor,Shengji International Building,Beijing Road,Yunhe District,Cangzhou City,Hebei Province,China 
    Tel : 0086-317-3736333
    Fax: 0086-317-2011165 
    Mail: abter2016@163.com

Main Keywords

  • API seamless Casing
  • oil casing pipe
  • Oilfield Steel Casing Pipe
  • n80 pipe
  • en10217 erw
  • 3pe steel pipe
  • J55 Seamless Casing
  • API 5DP drill pipe
HEBEI ABTER STEEL PIPE CO.,LTD - Mail : Abter2016@163.com