South Africa Drill Pipe Project
June 26, 2015
Pre-insulated pipe for Bangladesh Projects
June 26, 2015TOP Project Details
Project location | South Africa | Products | Economizer tubes | Standard & Material: | EN10216-2 |
---|---|---|---|---|---|
Specification: | 38X5, 51*4, 33.7*4.5 and so on | Application: | Heating Treatment | Quantity: | 277 tons |
Inquiry time | April, 2022 | Order Time: | July, 2022 | Shipping time | October, 2022 |
Arrive time: | Nov, 2022 | Third party inspection | EN10214 3.2 by TUV |
This order is from our old customer in South Africa who has been in business with us since 2016. The end user of this order is ESKOM. We completed the production on time and arranged the EN10214 3.2 inspection. Everything went very smoothly. Our customer is satisfied with our product quality and service.
Production Photos Inspection Photos Delivery photo
If you need the related MTC or third party inspection report of this project, please feel free to contact us.